Boeing 737 Max from Tui: The company wants the remaining aircraft later.

Agreement with BoeingTui defers delivery of remaining 737 Max by two years

The German travel giant has reached an agreement with Boeing. The aircraft manufacturer pays a compensation for a «substantial part of the damage» by the grounding of the 737 Max. Tui also wants the remaining jets later.

Top-Jobs

TAA Logo

Flight Dispatcher / Flight Operations Officer (m/w/d)

Feste Anstellung
Ambulanzflüge
Österreich
Vollzeit
Top jobs
TAA Logo

Sales Desk Agent

Feste Anstellung
Österreich
Vollzeit
Top jobs
Ambulanzflüge
.

Ausbildung zum Apron Controller (m/w/d) am Flughafen Frankfurt

Frankfrut
Vorfeldkontrolle
FRA-Vorfeldkontrolle GmbH
Deutschland
Vollzeit
Top jobs
aaa aviation academy austria logo

Fluglehrer/-in FI(A) mit Funktion Deputy CFI

Vollzeit
Aviation Academy Austria
Flugschule
Feste Anstellung
Top jobs
Wiener Neustadt - LOAN
Österreich

It's a large sum: In financial year 2018/19, which ended at the end of September, the grounding of the Boeing 737 Max resulted in costs of 293 million euros for Tui. If the grounding lasts until the autumn of this year, as it currently looks like, the German travel group expects further costs of 220 to 270 million euros. All in all, the problems with the new aircraft will cost them more than half a billion euros.

However, Tui will get a large part of the amount back. A compensation agreement had been reached with Boeing, «which covers a considerable part of the damage», the company announced on Wednesday (June, 3). The money will be paid back gradually over the next two years. In addition, credit will be given for future aircraft orders.

Tui gets only half as many aircraft

Tui currently owns 15 Boeing 737 Max. Eight more should have joined the fleet in 2019. But along with the compensation, the company has arranged a postponement of the delivery of the remaining 61 planes.

«In the next two years less than half of the originally planned aircraft will be delivered», a press release states. This supports the plan to reduce the fleet of the five Group airlines in Germany, the United Kingdom, Belgium, the Netherlands and Sweden as a result of the corona crisis. On average, deliveries will be postponed by two years.

Mehr zum Thema

Tui Boeing 787-8

Tui is ordering two additional Boeing 787

ticker-boeing-737max-8

Boeing bezeichnet Investorenklage zu 737 Max als «Zombie-Fraud»

ticker-boeing-1

Gericht: Boeing darf Ingenieurinnen und Ingenieure von Embraer abwerben

ticker-boeing-737max-8

Boeing verzeichnet im Juli weniger Auslieferungen und 31 Bestellungen - fast alles 737 Max

Video

phoenix sandsturm
Ein riesiger Sandsturm hat die Millionenstadt Phoenix und ihre Umgebung getroffen. Auch der Flughafen ist betroffen.
Timo Nowack
Timo Nowack
garuda indonesia special livery
Die Nationalairline Indonesiens feiert die Unabhängigkeitserklärung des Landes vor 80 Jahren. Dafür ließ Garuda eine Boeing 737 künstlerisch gestalten.
Timo Nowack
Timo Nowack
hurrikan erin noaa
Die Hurrikan-Jäger der amerikanischen Wetter- und Ozeanografiebehörde NOAA haben sich den Wirbelsturm Erin mit ihrem Turbopropflugzeug ganz aus der Nähe angeschaut - gerade, als dieser an Kraft weiter zulegte.
Timo Nowack
Timo Nowack