Boeing 737 Max from Tui: The company wants the remaining aircraft later.

Agreement with BoeingTui defers delivery of remaining 737 Max by two years

The German travel giant has reached an agreement with Boeing. The aircraft manufacturer pays a compensation for a «substantial part of the damage» by the grounding of the 737 Max. Tui also wants the remaining jets later.

Top-Jobs

Smartline

Commander / First Officer Cessna Latitude C680A (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna C560XLS (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna 525 (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Interpersonal

Trainer (SFI/TRI/TRE, all genders)

Interpersonal trainerpool
Vollzeit
Hamburg
Top jobs
Deutschland
Feste Anstellung
Luftfahrt

It's a large sum: In financial year 2018/19, which ended at the end of September, the grounding of the Boeing 737 Max resulted in costs of 293 million euros for Tui. If the grounding lasts until the autumn of this year, as it currently looks like, the German travel group expects further costs of 220 to 270 million euros. All in all, the problems with the new aircraft will cost them more than half a billion euros.

However, Tui will get a large part of the amount back. A compensation agreement had been reached with Boeing, «which covers a considerable part of the damage», the company announced on Wednesday (June, 3). The money will be paid back gradually over the next two years. In addition, credit will be given for future aircraft orders.

Tui gets only half as many aircraft

Tui currently owns 15 Boeing 737 Max. Eight more should have joined the fleet in 2019. But along with the compensation, the company has arranged a postponement of the delivery of the remaining 61 planes.

«In the next two years less than half of the originally planned aircraft will be delivered», a press release states. This supports the plan to reduce the fleet of the five Group airlines in Germany, the United Kingdom, Belgium, the Netherlands and Sweden as a result of the corona crisis. On average, deliveries will be postponed by two years.

Mehr zum Thema

Tui Boeing 787-8

Tui is ordering two additional Boeing 787

ticker-usa

US Navy sucht neue Kampfdrohne für Flugzeugträger

Boeing 737 Max 7: Klein, aber mit viel Reichweite ausgestattet.

Boeing bringt die 737 Max 7 ans Ziel - was sie den Kunden bietet

ticker-boeing-1

Boeings Tarifangebot findet erste Zustimmung bei Gewerkschaft - Streikrisiko sinkt

Video

boeing 777 300 er jetairwass vt jeq
Mehr als sieben Jahre stand eine Boeing 777-300 ER der einstigen indischen Fluglinie am Flughafen Mumbai. Jetzt hat der Langstreckenjet von Jet Airways Indien verlassen - immer noch in der alten Lackierung.
Timo Nowack
Timo Nowack
De Havilland Canada Dash 8-400 von Air Uniqon: Die Flüge werden von Avanti Air durchgeführt.
Die Erwartungen waren groß, die Nachfrage offenbar zu klein. Air Uniqon hat ihre Verbindung zwischen Friedrichshafen und Düsseldorf nach gut einem halben Jahr eingestellt. Für die virtuelle deutsche Airline wird nun der Winter zur entscheidenden Bewährungsprobe.
Stefan Eiselin
Stefan Eiselin
Airbus A350 F bei den Bodenschwingungstests: Der Flieger wird kräftig durchgeschüttelt.
Vor dem Einsatz muss ein neues Flugzeug zahlreiche Erprobungen bestehen. Airbus hat nun die Bodenvibrationstests des A350 F abgeschlossen. Sie liefern wichtige Erkenntnisse über das Schwingungsverhalten des Frachters und bilden die Grundlage für die Flugerprobung.
Stefan Eiselin
Stefan Eiselin