First part of the tank wall for the A321 XLR: The picture in the middle shows where the rear centre tank (green) is installed. Orange is an optional, smaller additional tank marked.

Additional tankThe centerpiece of the Airbus A321 XLR is under construction

From 2023 onwards Airbus plans to deliver the longest range version of the A321 Neo. Production of the 12,900-liter auxiliary tank for the XLR has now begun.

Top-Jobs

Pilatus Logo

Mechaniker & Spengler

Flugzeughersteller
Pilatus Flugzeugwerke AG
Schweiz
Vollzeit
Top jobs
Feste Anstellung
Weeze

Verkehrsleiter vom Dienst (w/m/x)

Flughafen Niederrhein GmbH
Weeze
Feste Anstellung
Deutschland
Vollzeit
Top jobs
DERTOUR Logo

Virtuelle Reisebetreuung (m/w/d)

Reiseveranstalter
DERTOUR Destination Services AG
Home Office
Vollzeit
Top jobs
Sparfell Logo

CAMO Engineer f/m/d (full time) in Vienna (Austria)

Vienna
Feste Anstellung
Business Aviation
SPARFELL Luftfahrt GmbH
Österreich
Vollzeit
Top jobs

The Airbus A321 XLR opens up completely new possibilities for airlines. Wizz Air and Czech Airlines, for example, want to conquer long-haul markets with the aircraft. Other providers are planning something similar. Who would have thought, for example, that Air Malta would be heading for India and the United States?

The rear centre tank of the A321 XLR makes this possible. This large additional tank is located in the fuselage, behind the wings. It holds 12,900 litres of fuel. As an additional option, airlines can have a smaller additional tank installed in the fuselage in front of the wings. This gives the aircraft a total range of up to 4700 nautical miles or 8700 kilometres.

Tanks are to be installed from early 2021

At the end of June, Airbus subsidiary and supplier Premium Aerotec in Germany began construction of the first rear centre tank, as the aircraft manufacturer announced on Monday (July, 6). Earlier this year, Airbus and Safran in France had already started the construction of other parts for the first prototype of an A321 XLR, which is scheduled to take off in 2022.

Airbus plans to make first deliveries of the XLR in 2023, and the tanks now being built are to be delivered to Airbus in Hamburg in early 2021, where they will be installed in the rear of the fuselage.

Mehr zum Thema

An Airbus A321 XLR.

How successful is Airbus with the A321 XLR?

ticker-airbus-konzern-

Airbus testet 5G-Funknetz aus dem All

boeing produktion (3)

Boeing triumphiert bei den Bestellungen, Airbus bei den Auslieferungen

ticker-airbus-neo-1

Airbus unzufrieden mit Liefertempo von Pratt & Whitney

Video

An einem Airbus A321 Neo: GTF-Triebwerk von Pratt & Whitney.
Der Chef des weltgrößten Leasingunternehmens hat Ratschläge für Fluggesellschaften mit Triebwerken der neuesten Generation. Aengus Kelly warnt vor Problemen und Herausforderungen sowohl bei Kurz- als auch Langstreckenflugzeugen.
Timo Nowack
Timo Nowack
airbusa350edelweissbusinesssuite003
Alles neu bei Edelweiss: Die Schweizer Ferienfluglinie stellt ihre komplett neu entwickelte Airbus-A350-Kabine vor. Premium Economy, Business Suite und ein aufgewertetes Design sollen das Langstreckenerlebnis neu definieren – ohne die Ferien-DNA zu verlieren. Genau darin liegt die Chance. Und das Risiko.
Luca La Rocca
Luca La Rocca
united airlines airbus a321 neo nosewheel
Harte Landung in Orlando: Ein Airbus A321 Neo von United Airlines hat bei der Ankunft in Orlando eines der Räder des Bugfahrwerkes verloren.
Timo Nowack
Timo Nowack