long-haul

First part of the tank wall for the A321 XLR: The picture in the middle shows where the rear centre tank (green) is installed. Orange is an optional, smaller additional tank marked.
Additional tank

The centerpiece of the Airbus A321 XLR is under construction

From 2023 onwards Airbus plans to deliver the longest range version of the A321 Neo. Production of the 12,900-liter auxiliary tank for the XLR has now begun.
07.07.20 - 09:33
Timo Nowack
Timo Nowack

Meistgelesen

afghanistan ueberfluege

Wie Flugzeuge ohne Flugsicherung über Afghanistan fliegen

ticker-russland

Russland gibt grünes Licht für Produktion der ersten 18 MS-21 und verpasst der Il-114-300 eine Finanzspritze

Top-Jobs

Smartline

Commander / First Officer Cessna Latitude C680A (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna C560XLS (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna 525 (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Interpersonal

Trainer (SFI/TRI/TRE, all genders)

Interpersonal trainerpool
Vollzeit
Hamburg
Top jobs
Deutschland
Feste Anstellung
Luftfahrt
Goldeck Logo

Kapitän Pilatus PC-12NGX (f/m/d)

Goldeck-Flug Gesellschaft m.b.H.
Vollzeit
Top jobs
Wien / Wiener Neustadt
Österreich
Feste Anstellung
Business Aviation