Boeing 737 Max: Das Grounding kommt den Hersteller teuer zu stehen.

Due to 737 MaxBoeing takes a charge of 5 billion dollars

The aircraft manufacturer Boeing sets aside a large provision because it has to compensate 737 Max customers.

Top-Jobs

AMX Support

Lizenzierter Fluggerätmechaniker / Certifying Staff B1/B2 (m/w/d)

AMX Support Germany GmbH
Vollzeit
Flughafen Oberpfaffenhofen (EDMO
Top jobs
Deutschland
Feste Anstellung
Luftfahrt
AMX Support

Flugzeug Mechaniker

AMX Support Germany GmbH
Vollzeit
Flughafen Oberpfaffenhofen (EDMO
Top jobs
Deutschland
Feste Anstellung
Luftfahrt
AMX Support

LAGER MITARBEITER (m/w/d) – Luftfahrt

Oberpfaffenhofen / Flughafen München (EDMO)
AMX Support Germany GmbH
Vollzeit
Top jobs
Deutschland
Feste Anstellung
Luftfahrt
Pilatus Logo

Lizenzierter Luftfahrzeugelektriker (a)

Vollzeit
Pilatus Flugzeugwerke AG
Flugzeughersteller
Feste Anstellung
Top jobs
Schweiz

Boeing remains optimistic. The aircraft manufacturer is working closely with the world's civil aviation authorities to end the grounding of the 737 Max. According to current estimates, it is expected that regulatory approval for recommissioning in the United States and other countries will be achieved at the beginning of the fourth quarter of 2019, the company announced on Thursday evening ( July 18th).

Others think early 2020 is more probable as a date of re-entry into service. However long it takes, one thing is clear: the longer the grounding takes, the more concerned customers will be. Various current and future operators of the 737 Max have already stated that they are seeking compensation from Boeing. They are losing revenue due to missing aircraft, and have to pay high costs for leasing and hiring replacement aircraft and crews.

Payments over several years

The aircraft manufacturer's management is aware that there is no way around responding to the demands. Boeing has therefore made a charge of 4.9 billion US dollars, which will be charged to the income statement for the second quarter. This was announced by Boeing on Thursday evening. The money will be used to pay compensation to customers, the company said. The measure will probably absorb the entire profit generated throughout the three months. Boeing points out, however, that although the entire amount will be charged to second quarter results, the payment will be made over several years.

Boeing does not only have to make high provisions for customer compensation. The aircraft manufacturer also suffers from higher costs as a result of lower output of 737 Max planes. This includes, for example, expenses for rented parking space for aircraft that cannot be delivered. According to Boeing, this amounts to another 1.7 billion dollars and reduces the margin in the second quarter and subsequent quarters.

Delivery lasting months

Boeing expects a gradual increase in the production rate as of 2020. From today's 42 737 Max per month, it is expected to rise again to 57. According to Boeing, the delivery of the aircraft produced since grounding in mid-March will take «several quarters» after the flight ban has been lifted.

Mehr zum Thema

Tailfin of a Ryanair aircraft: They operate a large fleet of solely 737 aircraft

737 Max forcing Ryanair to close bases

Cockpit einer 737 Max: Bald mehr Redundanzen.

New problem could lead to Boeing 737 Max nosediving

Boeing 737 Max beim Erstflug: Malaysia Airlines will den neuen Jet.

New problems with the Boeing 737 Max autopilot

ticker-boeing-787-9

Boeing weist im Juli nur 38 neue Bestellungen aus

Video

iberia sonnenfinsternis
Die Sonnenfinsternis hielten die Menschen an vielen Orten in Europa in Atem. Iberia beobachtete sie von einem Airbus A321 XLR aus - und hielt das im Video fest.
Timo Nowack
Timo Nowack
Der Unglücksort: Das Wrack der ATR 72 von Voepass.
Schon lange vor dem Absturz der ATR 72 mit 62 Toten waren bei Voepass Probleme mit Wartung und Enteisung bekannt. Dennoch wurde laut Erkenntnissen der brasilianischen Bundespolizei nicht konsequent gehandelt. Ihre Ermittlungen belasten die Fluggesellschaft - aber auch die Luftfahrtbehörde Anac.
Stefan Eiselin
Stefan Eiselin
erste boeing 737 max tarom
Die rumänische Fluglinie steht kurz vor der Übernahme ihrer ersten Boeing 737 Max. Das Flugzeug von Tarom trägt schon seine Bemalung - und die zeigt neue Designelemente.
Timo Nowack
Timo Nowack