Three aircraft starting at the same time: three runways make it possible.

Extension of Istanbul AirportThird runway to enable three parallel take offs

Despite the corona crisis, the new Istanbul Airport is pushing ahead with expansion. It has now opened the third parallel runway.

Top-Jobs

Smartline

Commander / First Officer Cessna Latitude C680A (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna C560XLS (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Smartline

Commander / First Officer Cessna 525 (m/f/d)

Smartline Luftfahrt GmbH
Vollzeit
Airport St. Gallen Altenrhein
Top jobs
Österreich
Feste Anstellung
Business Aviation
Interpersonal

Trainer (SFI/TRI/TRE, all genders)

Interpersonal trainerpool
Vollzeit
Hamburg
Top jobs
Deutschland
Feste Anstellung
Luftfahrt

Istanbul's new airport was officially opened on time - on 29 October 2018, the 95th anniversary of Mustafa Kemal Atatürk's proclamation of the Republic in 1923. However, it was not really finished at that time. The big move from the old to the new airport of the Turkish megacity took place in April 2019.

Since then, more than 64 million passengers have traveled through Istanbul Airport with more than 415,000 flights. They all took off and landed on the first two north-south runways. Soon there will be another possibility. On Sunday, President Recep Tayyip Erdogan officially opened the third parallel runway.

Up to eight runways

To celebrate, three planes of home carrier Turkish Airlines took off simultaneously into the Istanbul sky. On June, 18, the third runway of Istanbul Airport will be officially opened to traffic. In the final stage of construction, the airport will have six main runways and two auxiliary runways, which means up to eight runways.

Thanks to the third runway, landing times will be reduced «by an average of seven minutes and take-off times by an average of four minutes,» according to the airport. The capacity for aircraft movements per hour will increase from 80 to 120, and IATA is now able to handle 2800 aircraft movements per day. This is more than any other European airport, according to the operating company.

Mehr zum Thema

A British Airways Airbus A318 with registration number G-EUNB. In 2017, the airline sold the jet to ...

These Airlines still fly the Airbus A318

Boeing 737 from Sun Express: The German subsidiary will be closed down.

Sun Express Germany will be liquidated

Turkish Airlines Boeing 787: When will the rest be delivered?

Turkish Airlines wants long-haul jets delivered later

What we know about the crash landing in Istanbul so far

What we know about the crash landing in Istanbul so far

Video

erste boeing 737 max tarom
Die rumänische Fluglinie steht kurz vor der Übernahme ihrer ersten Boeing 737 Max. Das Flugzeug von Tarom trägt schon seine Bemalung - und die zeigt neue Designelemente.
Timo Nowack
Timo Nowack
fiat panda mailand linate hawker
Ungewöhnlicher Unfall am Flughafen Mailand-Linate: Ein Fiat Panda ist dort ungebremst mit einem rollenden Privatjet kollidiert, wie ein Video einer Überwachungskamera zeigt.
Timo Nowack
Timo Nowack
Flughafen Pereria: Massive Schäden am Terminal.
Ein Erdbeben der Stärke 7,4 hat im Westen Kolumbiens schwere Zerstörungen angerichtet und mindestens 110 Menschen das Leben gekostet. Auch der Luftverkehr ist betroffen: Sieben Flughäfen mussten ihren Betrieb einstellen.
Stefan Eiselin
Stefan Eiselin